Alarko ACK2 Specifications Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
- 2 -
1 INTRODUCTION
This manual comprises the information concerning the Installation, operation, use
and maintenance of ACK2 hot water boilers. This manual alone is not sufficient for
correct installation, operation and use, installers, services and user must obey the
rules specified in current EN + local norms, EC directives and local codes. This
manual gives supplementary information and precautions.
Keep this booklet near the appliance in a safe place in the boiler room for future
reference.
Please read the manual very carefully in order to be able to operate your boiler
safely and with high efficiency for a long period.
2 WARNINGS
This boiler must be installed in accordance with the rules in force only in a
well ventilated and frost free spaces.
All installation, assembly and maintenance work must be carried out
exclusively by fully trained, professionally qualified personnel and must
conform with this manual and the local codes and requirements of the
authority having jurisdiction, or in the absence of such requirements, apply to
the EEC directives and European norms (EN).
If the boiler is not used for the purposes other then specified in this booklet
and incorrect installation, commissioning and use can cause a fire or
explosion which may result property damage, personnel injury, or loss of life.
Boiler is designed for hot water operation only (less then the boiling
temperature) and the system pressure must be according to the limited
operating pressure specified on the boiler name plate and in this booklet.
Heat transfer medium is water.
Boilers must be fired by gas or oil fuels specified in this manual and boiler
plate.
Boilers must be fired by a compatible burner certified to EN 676 (gas firing) or
EN 267 (oil firing) to comply with the boiler efficiency requirement
(92/42/EEC) directive and Appliances burning gaseous fuels (90/396/EEC)
directive
This is a B
23
appliance so the flue gases must be connected to an adequate
draught chimney, without any flue gas leakage to the boiler room.
It is essential that an appropriate pump is fitted in the circulation system
which must be kept in automatic operation at all the times when the boiler in
use.
The filling and make up water must be according to the specifications given in
this manual. Long term water treatment is essential to the economic
operation and life of both new and refurbished heating systems.
Never obstruct the ventilation openings to the boiler room for a safe and
efficient operation. An adequate air supply for combustion and ventilation
must be provided at all times.
Boilers should be installed on a non-combustible, smooth and level foundation
which is at least 150 mm high and according to these manual and local codes.
Page view 2
1 2 3 4 5 6 7 8 ... 31 32

Comments to this Manuals

No comments